Directions of POWER-Z
MEDICINE
  • Directions of POWER-Z
  • Pipe line
Energy saving and alternative energy development are getting important than any other times as petroleum is pricing up, giving more pressure.

To supply to the pipe line directly

Connect about 15mm pipe with the pressure gauge or thermometer installed in the previous stage of the storage tank and then pump the POWER-Z in 1000:1 ration.

pipe